EQUIPMENT ISSUE // REFEREE INCIDENT LOG

INCIDENT WALLET

RESERVATION WINDOW OPENARCHIVE ISSUE EQ-026-004LIMITED RELEASE

Every decision leaves a paper trail.

Every match needs players. Every match needs officials. The Incident Wallet is inspired by referee reports, disciplinary logs, and official match records, a wallet disguised as an incident report and finished in card red.

  • Card red body with SENT OFF graphic.
  • Incident log and pitch schematic detailing.
  • Carbon strap card holder, everyday carry.
PRICE SET AT DEPLOYMENTLIMITED RELEASE  //  RESERVATION WINDOW OPEN
QUANTITY
1
No price, no payment. Reserving adds you to the waiting list and signals demand for this exact issue. Price is set when the collection deploys.
ISSUEEQ-026-004
REGIONNORTH AMERICA 2026
FIELD OPS Incident Wallet. Referee Incident Log.
01 / 01
WHY THIS EXISTS

Some objects help play the game.

Others help tell its story.

This is not a referee wallet. It is a tribute to the people who keep the game fair.

MATERIAL SPECIFICATION

FIELD OPS products are developed for repeated travel use rather than occasional event wear.

Materials are selected for durability, structure, color retention, and long term appearance.

Performance Priorities
  • Structure retention
  • Travel durability
  • Color stability
  • Abrasion resistance
  • Long term reliability

Every material is evaluated against the same requirement:

Would we want to carry this through a twelve hour travel day and still rely on it at the other end?

If the answer is no, it does not enter production.

PRODUCTION RECORD
CollectionFIELD OPS Launch Release
Production StatusPre Production Reservation Window
Release ClassificationFirst Release
AvailabilityLimited Production Run

FIELD OPS products are released in controlled production quantities rather than continuous inventory cycles. Once a production run concludes, future availability is determined by demand, manufacturing capacity, and collection strategy. Early reservation holders receive priority access before public release.

RELEASE TIMELINE
Current PhaseReservation Window
Next PhaseProduction Confirmation
Following PhasePriority Access Release
Final PhasePublic Availability (Subject To Inventory)

Reservation holders receive launch communication before public release begins.

CARE & MAINTENANCE

Built for the field.

Recommended Maintenance
  • Wipe clean with a damp cloth
  • Air dry fully before storage
  • Avoid prolonged direct heat
  • Store in a cool dry place
  • Do not machine wash

Proper maintenance preserves finish, structure, and performance throughout the life of the product.

WHY RESERVE NOW

The inaugural FIELD OPS release represents the first documented release of the project.

Reservation holders receive
  • Priority access before public release
  • Launch notifications
  • Inventory allocation priority
  • Collection updates
  • Early purchase opportunity

No payment is required today. A reservation simply secures your position before access opens to the public.

FIELD OPS™ ARCHIVE RECORDEQ-026-004
COLLECTIONEquipment Issue
UNITReferee Incident Log
ISSUEEQ-026-004
MATERIALAnodized Alloy // Carbon
CAPACITY6 Cards
AUTHENTICATED // ENTERED INTO THE FIELD OPS ARCHIVE // NORTH AMERICA 2026
COMPLETE THE DEPLOYMENT
REFEREE INCIDENT LOG  //  ARCHIVE ISSUE EQ-026-004

EVERY DECISION LEAVES A TRAIL.

The rarest issue in the Equipment line.

ENTER THE FIRST DEPLOYMENT LIST
NORTH AMERICA 2026  //  LIMITED RELEASE  //  EVERY DECISION LEAVES A PAPER TRAIL.