EQUIPMENT ISSUE // Operator Recovery Series

EXTRA TIME™ SLIDE

RESERVATION WINDOW OPENARCHIVE ISSUE EQ-026-013LIMITED RELEASE
COLORS
NavyCharcoalCream

The whistle blows. Recovery begins.

Ninety minutes end. The body keeps score. The EXTRA TIME Slide is the recovery layer for everything that happens after the final whistle. The walk back through the tunnel. The long travel days. The hours between matches when the work is simply staying ready.

  • Contoured recovery footbed with deep cushioning
  • Lightweight injected construction, tunnel to hotel
  • Water resistant, quick drying surface
  • Safety orange FIELD OPS hardware detail
  • Three archive colorways: Navy, Charcoal, Cream
  • Unisex sizing
PRICE SET AT DEPLOYMENTLIMITED RELEASE  //  RESERVATION WINDOW OPEN
SIZE
QUANTITY
1
No price, no payment. Reserving adds you to the waiting list and signals demand for this exact issue. Price is set when the collection deploys.
ISSUEEQ-026-013
REGIONNORTH AMERICA 2026
EXTRA TIME Slide, Navy.
EXTRA TIME Slide, Charcoal.
EXTRA TIME Slide, Cream.
01 / 03
WHY THIS EXISTS

Some objects help play the game.

Others help tell its story.

The match ends. The recovery begins. This is built for everything after the final whistle.

MATERIAL SPECIFICATION

FIELD OPS products are developed for repeated travel use rather than occasional event wear.

Materials are selected for durability, structure, color retention, and long term appearance.

Performance Priorities
  • Structure retention
  • Travel durability
  • Color stability
  • Abrasion resistance
  • Long term reliability

Every material is evaluated against the same requirement:

Would we want to carry this through a twelve hour travel day and still rely on it at the other end?

If the answer is no, it does not enter production.

PRODUCTION RECORD
CollectionFIELD OPS Launch Release
Production StatusPre Production Reservation Window
Release ClassificationFirst Release
AvailabilityLimited Production Run

FIELD OPS products are released in controlled production quantities rather than continuous inventory cycles. Once a production run concludes, future availability is determined by demand, manufacturing capacity, and collection strategy. Early reservation holders receive priority access before public release.

RELEASE TIMELINE
Current PhaseReservation Window
Next PhaseProduction Confirmation
Following PhasePriority Access Release
Final PhasePublic Availability (Subject To Inventory)

Reservation holders receive launch communication before public release begins.

CARE & MAINTENANCE

Built for the field.

Recommended Maintenance
  • Wipe clean with a damp cloth
  • Air dry fully before storage
  • Avoid prolonged direct heat
  • Store in a cool dry place
  • Do not machine wash

Proper maintenance preserves finish, structure, and performance throughout the life of the product.

WHY RESERVE NOW

The inaugural FIELD OPS release represents the first documented release of the project.

Reservation holders receive
  • Priority access before public release
  • Launch notifications
  • Inventory allocation priority
  • Collection updates
  • Early purchase opportunity

No payment is required today. A reservation simply secures your position before access opens to the public.

FIELD OPS™ ARCHIVE RECORDEQ-026-013
COLLECTIONOperator Recovery Series
UNITExtra Time Slide
ISSUEEQ-026-013
CONSTRUCTIONInjected EVA // Contoured Footbed
AUTHENTICATED // ENTERED INTO THE FIELD OPS ARCHIVE // NORTH AMERICA 2026
COMPLETE THE DEPLOYMENT
Operator Recovery Series  //  ARCHIVE ISSUE EQ-026-013

STAY READY.

For the long tournament, the recovery layer that travels with you.

ENTER THE FIRST DEPLOYMENT LIST
NORTH AMERICA 2026  //  LIMITED RELEASE  //  THE WHISTLE BLOWS. RECOVERY BEGINS.